Lined slurry and digestate lagoons for farms and AD plants.

Slurry and digestate storage is regulated for a reason — one failure can put a farm's future and a watercourse at risk. We line new and existing lagoons with welded membrane systems — from a single liner on protection fleece to a double-lined build-up with leak detection and a floating cover — built to satisfy storage regulations and the inspector who enforces them.

Applications
Slurry, digestate, dirty water
Liners
HDPE / LLDPE, single or double
Protection
300gsm non-woven fleece beneath
Leak detection
Drainage layer between liners
Large slurry lagoon lined with welded membrane across base and banks
On site · 01/06
Slurry lagoon — welded liner, full basin

Slurry Lagoons in short

A lined slurry lagoon is a store for slurry, digestate or dirty water, sealed with a welded membrane so that its contents cannot leak into the ground. Aquatech Civils lines new and existing lagoons, from a single welded liner on protection fleece to a double-lined HDPE or LLDPE build-up with leak detection and a floating cover. Every job has a recorded test weld and a compliance QA pack.

The system

What's in the package

One team from supply to handover documentation.

  1. Liner build-up specified for the stored material
  2. Protection fleece beneath the liner
  3. Welded primary and secondary liners, with a recorded test weld
  4. Leak-detection layer and floating cover where specified
  5. Fill, draw-off and level detailing
  6. Compliance documentation pack

How it goes in

Installation process

  1. 01

    PH-01

    Requirements & build-up

    Capacity, freeboard and the liner build-up — single or double-lined, with or without leak detection and a floating cover — are confirmed against the design before anything is ordered.

  2. 02

    PH-02

    Profile check

    Banks, base and anchor trenches are formed by your earthworks contractor. We check the profile and the trenches against the lining design before the liner arrives.

  3. 03

    PH-03

    Fleece & first liner

    A protective non-woven fleece goes down first, so the formation can't puncture what goes on it. The first impermeable liner — the secondary liner on a double-lined lagoon — is deployed over it and welded panel to panel.

  4. 04

    PH-04

    Drainage layer & primary liner

    Where the design is double-lined, a drainage medium goes over the secondary liner to carry any seepage to a leak-detection point, then the primary liner is welded over the top.

  5. 05

    PH-05

    Fittings, testing & cover

    Fill points, draw-off and level indication are detailed and sealed, a test weld is recorded, and a floating cover is fitted where specified.

  6. 06

    PH-06

    Compliance handover

    You receive the QA pack — materials, weld records, as-builts — that inspections and insurers ask for.

Specification

Specification

System datasheetSVC-05
Applications
Slurry, digestate, dirty water
Liners
HDPE / LLDPE, single or double
Protection
300gsm non-woven fleece beneath
Leak detection
Drainage layer between liners
Cover
Floating cover option
Detailing
Anchor trench, fittings, gauges
Records
Full QA / weld documentation
Sectors
Agriculture · AD / energy

Turnkey

One team from supply to handover documentation.

Welded, never taped

Every membrane joint heat-welded into a continuous barrier, with a recorded test weld on every job.

Documented to sign-off

QA and handover records as standard, covering what building control and adopting authorities ask for.

UK-wide

Midlands based and working the length of the country, with 25+ years in the ground.

Asked on site

Frequently asked questions

Broadly: enough capacity for the storage period your situation demands, adequate freeboard, and construction that won't leak — with rules such as SSAFO applying to new and substantially altered stores. Your consultant confirms the specifics; our lining and documentation are built to satisfy them.

Often, yes — after inspection. Banks are re-profiled where needed, the formation is prepared, and the welded liner is installed with proper anchorage. It's routinely cheaper than building new storage.

It depends on what's stored and what the permit asks for. On our most recent lagoon, from the bottom up: a 300gsm non-woven protection geotextile, a 1.5mm HDPE secondary liner, an intermediate drainage layer, a 2mm primary liner, and a 1.5mm floating cover over the top. A simpler store may need only the fleece and a single welded liner.

A drainage medium between a primary and a secondary liner that routes any seepage from the primary to an inspection point — so you can prove the lagoon is tight instead of assuming it. Some permits require it; we install it where specified.

Welded HDPE and LLDPE systems are engineered for decades of service in contact with slurry. The liner generally outlives the pumps and fittings around it.