Skip to content

About Aquatech

About Aquatech Civils

Aquatech Civils installs attenuation tanks, soakaways, pond and lagoon liners, and gas membranes. We're based in the Midlands and work across the UK.

Our own crews and kit, UK-wide

Aquatech Civils · Our own crews and kit, UK-wide

Who we are

We're a specialist installer, not a general groundworks firm that also does liners. Attenuation and geo-lining is the whole job — which is why developers, groundworkers and contractors bring us in for the part of the programme they can't afford to get wrong.

Between us the team carries over twenty-five years of combined experience and hundreds of completed projects, from single soakaways to basins measured in thousands of square metres. We run our own geomembrane welding equipment and bring the same testing discipline to every system, residential or industrial.

The work is turnkey by default: supply and install, or install into your dig, with the welding, testing and documentation ours to stand behind.

25+

Years of combined experience

100s

Projects delivered nationwide

970m³

Largest single tank

100%

Jobs QA'd and documented

How we work

How we work

01

Turnkey, not just labour

One team responsible from supply through to handover, with the documentation to show the system was installed correctly.

02

Welded, never taped

Every membrane joint we make is heat-welded into a continuous barrier. We carry out a test weld on each job and record it in the QA pack.

03

Documented to sign-off

Weld records, as-builts and QA packs come as standard. They cover what building control, adopting authorities and warranty providers ask for.

04

Straight with you on site

If a soakaway won't drain in your ground, or supplied materials will cost you welds, we say so before we start.

On site

On site

  • Geocellular attenuation tank · lined excavation
    Geocellular attenuation tank · lined excavation
  • HDPE pond lining · membrane dressed and welded
    HDPE pond lining · membrane dressed and welded
  • GCL basin · bentonite liner, base and banks
    GCL basin · bentonite liner, base and banks
  • Slurry lagoon · welded liner
    Slurry lagoon · welded liner
  • Galvanised steel tank · bolted panels
    Galvanised steel tank · bolted panels
  • Gas membrane · laid across house plots
    Gas membrane · laid across house plots
  • Crates placed by hand · attenuation build
    Crates placed by hand · attenuation build
  • Weld pressure-test · gauge on the seam
    Weld pressure-test · gauge on the seam

Handed over

Completed installations

  • Lined pond, dressed and anchored
    Lined pond, dressed and anchored
  • Completed pond — planted and filled
    Completed pond — planted and filled
  • Galvanised tank in service
    Galvanised tank in service
  • Tank complete under fleece, ready for backfill
    Tank complete under fleece, ready for backfill

On the tools

Our team

Work with us
Crew dressing the liner up the banks
Crew dressing the liner up the banks
Working the protection fleece across the base
Working the protection fleece across the base
Welding on site
Welding on site
Crew across the lined base
Crew across the lined base

Tell us about your project

Quote back within one working day