LIN-BMH · Lining & containment
2,000m² farm slurry lagoon lining
A 2,000m² slurry lagoon at Bodymoor Heath, lined in welded LLDPE between two layers of 300g/m² fleece for manure and wastewater storage on a farm.
- Location
- Bodymoor Heath
- Region
- Midlands
- Sector
- Agriculture
- Completed
- 2025

Lining & containment · Bodymoor Heath
2,000m²
- Ref
- LIN-BMH
- Region
- Midlands
- Sector
- Agriculture
- Year
- 2025
What we did
A 300g/m² protection fleece laid on the prepared formation, the LLDPE membrane deployed across the lagoon and welded into a watertight seal, then a second 300g/m² fleece over the top to protect the liner from stones and livestock.
The tricky bits
Wet weather during the install. The work was resequenced to keep the lagoon on programme, with final checks across the lining before handover.
What we delivered
A lined, sealed 2,000m² lagoon, completed on time and now in use for the farm's slurry storage.
Why the lagoon is lined
A lined lagoon holds slurry where it can't reach the ground or a watercourse. For the farm, it's a large-capacity store that helps meet the storage regulations, at a lower installed cost than a slurry tank of the same size.
Handover
Final checks were made across the lining to confirm a fully sealed system before handover. The lagoon was completed on time in 2025 and is now in use for the farm's slurry storage.
- Area
- 2,000 m²
- Membrane
- LLDPE, welded
- Protection
- 300g/m² fleece, both faces