Skip to content

Attenuation Tanks · West Midlands

Attenuation tank installation in Birmingham

We supply and install geocellular attenuation tanks on Birmingham sites of every size, from a tight city-centre plot to a school playing field. Your engineer sizes the tank, your groundworker digs it, and we build it, weld it and hand it over with the paperwork.

Where we install
  • Edgbaston
  • Digbeth
  • Erdington
  • Sutton Coldfield
  • Selly Oak
  • Northfield
  • Kings Norton
  • Hall Green
  • Yardley
  • Small Heath

Base · Tamworth B78 2BP

Why Birmingham sites store water rather than soak it away

Much of Birmingham sits on clay. Where the ground is mudstone or boulder clay, water has nowhere to go, and an infiltration test usually confirms what the engineer already suspected. Where there is better-draining sandstone, a dense city often leaves no room for the clearances a soakaway needs from foundations and boundaries.

So the surface water goes to the sewer or a watercourse, and the planning condition caps how fast it can get there. The Rea, the Tame and the Cole all carry the city's runoff, and none of them has room for a new development to add its peak flow. A sealed attenuation tank holds the storm and lets it out at the agreed rate through a flow control.

City-centre plots and suburban schemes

Birmingham work splits into two kinds of job. In and around the centre, regeneration sites are hemmed in by roads, neighbours and live services, and the tank often goes under a car park, a service yard or a podium. Out in the suburbs it is housing, schools and community buildings, where there is more space but a landscaped or trafficked surface on top.

Both suit a crate tank. Crates build to the shape of the hole, so an awkward footprint or a long, narrow trench is no problem. We built a 115m³ tank at Swanhurst School in Birmingham as a single long run alongside the site, wrapped and finished ready for the groundworker to backfill.

  • Car parks, service yards and access roads over the tank
  • Long, narrow runs along boundaries where space is short
  • School and public-building sites with term-time access limits
  • Housing estates with tanks under shared open space

Getting on and off a city site

From our Tamworth base, Birmingham is a short run in on the A38 or the M6, which lets us fit around the delivery windows and loading restrictions that come with city work. We agree a drop time for the crates and membrane, keep the materials inside the site boundary, and work to the groundworker's programme so the dig doesn't stand open any longer than it must.

The first thing we look at is the formation. Uneven ground, loose spoil or a base that wants blinding gets raised on the day, while it can still be put right, not once a tank sits on it.

What you get at handover

Every Birmingham tank is wrapped in protective fleece and an impermeable membrane with heat-welded seams, never tape. The crates, at 95–97% void, are stacked to the storage volume and load rating the drainage drawings set out. Each Birmingham job includes a test weld we put on record, and the QA and handover file we leave is the one building control and the adopting authority will ask to see.

Attenuation Tank Installer Birmingham

Frequently asked questions

Yes. Crates are delivered on pallets and built by hand inside the excavation, so we need room for a drop and a small laydown area, not a large compound. We plan deliveries around the site's access and loading rules.

If the engineer specifies it. Crates come in loading classes from landscaped to highway-rated, and we build to the class and cover depth shown on the drainage design.

Yes. We installed a 115m³ attenuation tank at Swanhurst School. School jobs usually mean fixed access hours and a fenced working area, and we plan the install around both.

No. We don't dig. Your groundworker excavates, forms and backfills. Once the formation passes our check, we lay fleece and membrane, assemble the crates, make the connections, then test and document everything.

Tell us about your project

Quote back within one working day