ATC-0500 · Attenuation
500m³ attenuation tank at a rugby club development
A 500m³ Hydrocell attenuation tank for a residential development at a rugby club in Bournville, wrapped in 0.6mm HDPE membrane and 300g/m² fleece to control surface water runoff from the site.
- Location
- Bournville, Birmingham
- Region
- West Midlands
- Sector
- Residential
- Completed
- 2025

Attenuation · Bournville, Birmingham
500m³
- Ref
- ATC-0500
- Region
- West Midlands
- Sector
- Residential
- Year
- 2025
What we did
We supplied and installed the 62-tonne-rated Hydrocell crates, built to 500m³, wrapped them in a 0.6mm HDPE membrane welded into a fully sealed system, and protected the wrap with a 300g/m² geotextile fleece.
The tricky bits
A tight programme on a residential site with limited space. Deliveries and the installation sequence were planned around the rest of the build, and the HDPE welds were tested as part of our quality control before the tank was handed back.
What we delivered
A watertight 500m³ tank with tested welds, installed on time and within the customer's budget.
Welding the HDPE
Welding HDPE into a single sealed wrap around a 500m³ block takes specialist technique. Every joint was heat-welded rather than taped, then tested before the tank was covered.
Working with the site
We worked with the site team on deliveries and access so the tank went in without disrupting the wider build. Every stage, from quotation through installation to final testing, was completed on time.
- Volume
- 500 m³
- System
- Hydrocell crates, 62t rated
- Membrane
- 0.6mm HDPE, welded and tested
- Fleece
- 300g/m²
- Scope
- Supply & install