LIN-HS2 · Lining & containment

HS2 pond lining in 1mm HDPE

A lined pond on the HS2 route near Coventry: three rolls of 1mm Atarfil HDPE welded over geotextile, detailed around two concrete headwalls and tested seam by seam.

Location
Coventry
Region
West Midlands
Sector
Infrastructure
Completed
2026
Welded 1mm HDPE panels laid over geotextile across the HS2 pond near Coventry
Rec · LIN-HS2Coventry — Infrastructure

Lining & containment · Coventry

HS2

Ref
LIN-HS2
Region
West Midlands
Sector
Infrastructure
Year
2026
01

What we did

Formation covered in NW100 geotextile (supplied by the client), then three rolls of 1mm Atarfil HDPE deployed across the pond and up the banks, welded panel to panel and sealed to the two headwalls.

02

The tricky bits

Headwalls are where pond liners leak. Each one was detailed separately so the liner seals to the concrete with no gaps, and every weld was pressure-tested, numbered and marked as passed on the membrane.

03

What we delivered

A tested, documented pond lining on one of the country's biggest infrastructure projects.

04

The liner

HDPE is the liner we recommend for large ponds and reservoirs, and for the toughest UV and chemical exposure. Three rolls of Atarfil were deployed over the NW100 underlay, which keeps the formation from working against the liner from below.

The panels were placed and seam-welded on site. The two headwalls were treated as separate details.

05

Sign-off

Seams and details were inspected and the weld test records completed before we left site. The lining was signed off in August 2026, handed over with the weld test records and documentation.

Project datasheetLIN-HS2
Application
Pond lining
Membrane
1mm Atarfil HDPE, 3 rolls
Geotextile
NW100
Details
2 headwalls
System · Pond Lining

On site · Coventry

HDPE liner sealed around a concrete headwall at the HS2 pond
Rec · LIN-HS2Coventry — Infrastructure
Weld test #1 marked 'HS2 pass' on the pond liner