Skip to content

LIN-WOR · Lining & containment

3,500m² lined attenuation basin

A 3,500m² surface-water attenuation pond lined in 1mm HDPE for a residential development of around 50 homes in Worcester — part of the site's drainage strategy.

Location
Worcester
Region
West Midlands
Sector
Residential
Completed
2025
The 3,500m² Worcester attenuation basin lined with welded HDPE membrane, at dusk
Rec · LIN-WORWorcester — Residential

Lining & containment · Worcester

3,500m²

Ref
LIN-WOR
Region
West Midlands
Sector
Residential
Year
2025
01

What we did

Protective 300g/m² geotextile fleece below and above a 1mm HDPE impermeable membrane, the membrane welded panel to panel, joints sealed and quality checked across the full basin.

02

The tricky bits

Scale. A lined area this size needs the membrane deployment planned in detail, and HDPE rolls of this weight and width need specialist lifting equipment — all while meeting the environmental requirements and the budget.

03

What we delivered

A fully sealed, durable attenuation pond serving the drainage needs of the development, delivered on schedule.

04

What the basin does

The pond is part of the development's surface water strategy. It stores runoff from the homes and releases it at a controlled rate, to meet the site's drainage and planning requirements over the life of the development.

05

Handling the liner

1mm HDPE comes in heavy, wide rolls, and over 3,500m² there are a lot of them. Specialist membrane lifting and handling equipment let the crew place large sections accurately, without damaging or distorting the liner, which cut the installation time.

Project datasheetLIN-WOR
Area
3,500 m²
Membrane
1mm HDPE, welded
Protection
300g/m² fleece, both faces
Serves
~50 homes
Sector
Residential
System · Pond Lining
Next in the log · ATC-0500

500m³ attenuation tank at a rugby club development

Tell us about your project

Quote back within one working day