LIN-ASH · Lining & containment
Plot lining at a waste recycling facility
Plot lining at Suez's recycling facility in Ashington: seven rolls of GP Titanbond membrane laid across the plot and detailed into every sump.
- Location
- Ashington, Northumberland
- Region
- Northumberland
- Sector
- Waste / recycling
- Completed
- 2026

Lining & containment · Ashington, Northumberland
7 rolls
- Ref
- LIN-ASH
- Region
- Northumberland
- Sector
- Waste / recycling
- Year
- 2026
What we did
GP Titanbond membrane laid across the prepared plot, joined panel to panel, and dressed down into each sump box so the barrier runs continuously into the drainage points.
The tricky bits
A plot this size has several sumps, and each one is a box to be formed by hand: four corners and four walls, with the membrane cut and sealed so there's no weak point where water collects.
What we delivered
A continuous, checked plot lining, verified on site and handed over for the next stage.
The membrane
Seven rolls of GP Titanbond membrane covered the plot. The rolls were laid out across the prepared formation and joined to the manufacturer's specification, so the barrier forms one continuous sheet from edge to edge and down into each sump.
Sign-off
The lining was checked and verified on site, and the job was signed off in July 2026 with the installation records handed over.
- Application
- Plot lining
- Membrane
- GP Titanbond, 7 rolls
- Detailing
- Sump boxes
- Sector
- Waste / recycling
On site · Ashington, Northumberland
On site



Attenuation tank beside York station
Tell us about your project
Quote back within one working day
