Slurry Lagoon Installation – Bodymoor Heath

Case Study - Slurry Lagoon Installation – Bodymoor Heath

Project Overview
We were commissioned to install a slurry lagoon for an agricultural client in Bodymoor Heath, providing a cost-effective and environmentally friendly solution for manure and wastewater storage. The lagoon was lined with a 0.75mm LLDPE membrane, protected by a 300g/m² fleece above and below the impermeable liner to ensure long-term durability and resistance to punctures.
Why Slurry Lagoons?
Slurry lagoons are a highly efficient way for farms to manage livestock waste, offering several key benefits:
-Cost-Effective Storage: Large capacity with lower installation costs compared to traditional slurry tanks.
-Environmental Protection: Prevents groundwater contamination by securely containing waste.
- Regulatory Compliance: Helps meet environmental and agricultural regulations for slurry management.
Flexible Design: Can be customised in size and depth to suit farm needs.
Scope of Work
  • Excavation & Ground Preparation – Ensuring a level and stable base for lagoon construction.

  • Installation of 0.75mm LLDPE Membrane – A highly durable liner providing excellent chemical resistance.

  • Placement of 300g/m² Fleece (Above & Below the Membrane) – To protect against punctures from stones or animal activity.

  • Quality Assurance & Final Checks – Ensuring a fully sealed system with no risk of leakage.

Execution
Our team worked efficiently to excavate and prepare the lagoon site, ensuring a smooth installation process. The 0.75mm LLDPE membrane was carefully positioned and welded to create a watertight seal. The 300g/m² fleece layer provided essential protection against sharp objects and mechanical damage, extending the life of the lagoon.
Challenges & Solutions
  • Ground Conditions: The site had some uneven terrain, which we carefully graded to create a stable base.

  • Weather Factors: Wet conditions posed a challenge, but our team adapted the workflow to keep the project on track.

Outcome
The project was completed on time and to the highest standard, providing the client with a high-capacity, low-maintenance slurry storage solution. The lagoon is now fully operational, ensuring safe and compliant waste management for the farm.
Client Feedback
"A brilliant job from start to finish. The team were efficient, professional, and knew exactly what they were doing. The quality of the liner and installation was spot on, and the lagoon is performing perfectly. Highly recommend!"